6. A table is assembled using three components, as shown in the accompanying product structure… 1 answer below »

6.                                                                                                                                                                         A table is assembled using three components, as shown in the accompanying product structure tree. The company that makes the table wants to ship 100 units at the beginning of day 4, 150 units at the beginning of day 5, and 200 units at the beginning of day 7. Receipts of 100 wood sections are sched- uled at the beginning of day 2. There are 120 legs on hand. An additional 10 percent of the order size on legs is added for safety stock. There are 60 braces on hand with no safety stock requirement   for braces. Lead times (in days) for all items are shown in the following table. Prepare a material require- ments plan using lot-for-lot ordering.

 

 

 

 

Quantity

Lead Time

1–200

1

201–550

2

551–999

3

    Wood sections (2)

Table Braces (3)

 

 

Legs (4)

 

Needs help with similar assignment?

We are available 24x7 to deliver the best services and assignment ready within 3-4 hours? Order a custom-written, plagiarism-free paper

Order Over WhatsApp Place an Order Online

Do you have an upcoming essay or assignment due?

All of our assignments are originally produced, unique, and free of plagiarism.

If yes Order Similar Paper