17.             Given the following information on job times and due dates, determine the optimal processing sequence using (1) FCFS, (2) SPT, (3) EDD, and (4) CR. For each method, find the average job flow time and the average job tardiness.

   

Job

Job Time (hours)

Due Date (hours)

a

3.5

7

b

2.0

6

c

4.5

18

d

5.0

22

e

2.5

4

f

6.0

20